The installing contractor, engineer of record, owner’s agent, or the person responsible for certification of the acceptance testing/verification on the Certificate of Acceptance (Responsible Person) must review the plans and specifications to ensure that they conform to the acceptance requirements. This is typically done prior to signing a Certificate of Compliance.
In reviewing the plans, the designer will be noting on the:
• NRCC-ENV-01-E,
• NRCC-MCH-01-E,
• NRCC-LTI-01-E,
• NRCC-LTO-01-E,
• NRCC-PRC-06-E
code compliance forms, all of the respective envelope, mechanical, lighting, electric resistance underfloor heating, and refrigeration systems that will require acceptance tests, and the parties responsible for performing the tests. An exhaustive list is required so that when the acceptance tests are bid, all parties are aware of the scope of acceptance testing on the project.