13.49   Administrative Regulations

The administrative requirements contained in the Standards require the refrigerated warehouse plans to contain:

      Applicable Refrigerated Warehouse Compliance Forms: NRCC-PRC-06-E which includes the required acceptance tests and forms NRCC-PRC-07-E and NRCC-PRC-08-E as applicable.

      A note that specifies that the Record drawings (“as built” drawings) are provided to the building owners within 90 days of receiving a final occupancy permit.

Additionally the administrative requirements contained in the Standards require:

      Installation certificates for refrigeration warehouses: NRCI-PRC-01-E

      Refrigerated Warehouse Acceptance testing forms, NRCA-PRC-04-A, NRCA-PRC-05-A, NRCA-PRC-06-A, NRCA-PRC-07-A and NRCA-PRC-08-A.

      Operating and maintenance information to be provided to the building to be left in the building after occupancy