The construction inspection is the first step in performing the Acceptance Tests. In general, this inspection should identify:
• Equipment and controls are properly specified, correctly installed, sensors are calibrated and setpoints and schedules are established.
• Documentation is available to identify settings and operation for each device.
The functional testing is to be performed on the following systems/equipment, according to the steps 'listed in the respective acceptance test forms.
• NRCA-PRC-01-A – Compressed Air System Acceptance
• NRCA-PRC-02-A – Commercial Kitchen Exhaust System Acceptance
• NRCA-PRC-03-F – Enclosed Parking Garage Exhaust System Acceptance
• NRCA-PRC-04-A – Refrigerated Warehouse – Evaporator Fan Motor Controls Acceptance
• NRCA-PRC-05-A – Refrigerated Warehouse – Evaporative Condenser Controls Acceptance
• NRCA-PRC-06-A – Refrigerated Warehouse – Air-Cooled Condenser Controls Acceptance
• NRCA-PRC-07-A – Refrigerated Warehouse – Compressor Variable Speed Acceptance
• NRCA-PRC-08-A – Refrigerated Warehouse – Electric Resistance Underslab Heating System Acceptance