The construction inspection is the first step in performing the Acceptance Tests. In general, this inspection should identify:
•Equipment and controls are properly specified, correctly installed, sensors are calibrated and setpoints and schedules are established.
•Documentation is available to identify settings and operation for each device.
The functional testing is to be performed on the following systems/equipment, according to the steps 'listed in the respective acceptance test forms.
•NRCA-PRC-01-A – Compressed Air System Acceptance
•NRCA-PRC-02-A – Commercial Kitchen Exhaust System Acceptance
•NRCA-PRC-03-F – Enclosed Parking Garage Exhaust System Acceptance
•NRCA-PRC-04-A – Refrigerated Warehouse – Evaporator Fan Motor Controls Acceptance
•NRCA-PRC-05-A – Refrigerated Warehouse – Evaporative Condenser Controls Acceptance
•NRCA-PRC-06-A – Refrigerated Warehouse – Air-Cooled Condenser Controls Acceptance
•NRCA-PRC-07-A – Refrigerated Warehouse – Compressor Variable Speed Acceptance
•NRCA-PRC-08-A – Refrigerated Warehouse – Electric Resistance Underslab Heating System Acceptance