At the time a building permit application is submitted to the enforcement agency, the applicant also submits plans and energy compliance documentation. This section describes the forms and procedures for documenting compliance with the solar ready requirements of the Standards. The following discussion is addressed to the designer preparing construction and compliance documents, and to the enforcement agency plan checkers who are examining those documents for compliance with the Standards.
There are four forms associated with the nonresidential solar ready requirements. Each form is briefly described below.
•CF1R-SRA-01-E: Certificate of Compliance: Residential Solar Ready Areas
This form is required for every project where the solar ready requirements apply: newly constructed single family residences and low-rise multifamily buildings.
•CF1R-SRA-02-E: Certificate of Compliance: Minimum Solar Zone Area Worksheet
This form is required when buildings comply with the solar ready requirement by including a solar zone. That is, an appropriately sized solar PV system is not installed, an appropriately sized solar water heating system is not installed, the building does not comply with all the OCST and high-efficacy lighting requirements or the roof is not designed for vehicle traffic or a heliport.
•CF2R-SPV-01-E: Certificate of Installation – Solar Photovoltaic System
This form is required when the building is exempt from the solar zone requirements because an appropriately sized solar PV system has been installed.
•CF2R-STH-01-E: Certificate of Installation – Solar Water Heating System
This form is required when the building is exempt from the solar zone requirements because an appropriately sized solar water heating system has been installed.