'Standards
120.8(a) Summary of Commissioning Requirements.
120.8(b) Owner’s or Owner Representative’s Project Requirements (OPR).
120.8(c) Basis of Design (BOD).
120.8(d) Design Phase Design Review.
120.8(e) Commissioning measures shown in the construction documents.
120.8(g) Functional performance testing.
120.8(h) Documentation and training.
120.8(i) Commissioning report.