SECTION 140.2 – PRESCRIPTIVE APPROACH

In order to comply with the prescriptive approach under this section, a building shall be designed with and shall have constructed and installed:

(a)  A building envelope that complies with Section 140.3(a) or 140.3(b), and for applicable buildings Section 140.3(c);

(b) A space-conditioning system that complies with Section 140.4;

(c)  A service water-heating system that complies with Section 140.5;

(d) A lighting system that complies with Section 140.6;

(e)  An outdoor lighting system that complies with Section 140.7;

(f)  Interior and exterior signs that comply with Section 140.8; and

(g) Covered processes that comply with Section 140.9.