'Standards
120.8(a) Summary of Commissioning Requirements
120.8(b) Owner’s or Owner Representative’s Project Requirements (OPR).
120.8(c) Basis of Design (BOD)
120.8(d) Design Phase Design Review
120.8(e) Commissioning measures shown in the construction documents
120.8(g) Functional performance testing
120.8(h) Documentation and training.
120.8(i) Commissioning report.