NOTE: For Documents and User Instructions, please visit our website at: http://www.energy.ca.gov/title24/2019standards
Certificate of Compliance | |||
NRCC-CXR-E |
Commissioning Review |
Enforcement Agency |
|
NRCC-ELC-E |
Electrical |
Enforcement Agency |
Electrical Power Distribution |
NRCC-ENV-E |
Enforcement Agency |
||
NRCC-LTI-E |
Lighting - Indoor |
Enforcement Agency |
Indoor Lighting |
NRCC-LTO-E |
Lighting - Outdoor |
Enforcement Agency |
Outdoor Lighting |
NRCC-LTS-E |
Lighting - Sign |
Enforcement Agency |
Sign Lighting |
NRCC-MCH-E |
Mechanical |
Enforcement Agency |
Mechanical Systems |
NRCC-PLB-E |
Plumbing |
Enforcement Agency |
Water Heating Systems |
NRCC-PRC-E |
Process |
Enforcement Agency |
Covered Processes |
NRCC-SRA-E |
Solar Ready |
Enforcement Agency |
Solar Ready Areas |
Certificate of Installation | |||
NRCI-ELC-01-E |
Electrical |
Enforcement Agency |
Electrical Power Distribution |
NRCI-ENV-01-E |
Envelope |
Enforcement Agency |
Envelope |
NRCI-LTI-01-E |
Lighting - Indoor |
Enforcement Agency |
Indoor Lighting |
NRCI-LTI-02-E |
Lighting - Indoor |
Enforcement Agency |
Energy Management Control System (EMCS) or Lighting Control System |
NRCI-LTI-04-E |
Lighting - Indoor |
Enforcement Agency |
Two Interlocked Lighting Systems |
NRCI-LTI-05-E |
Lighting - Indoor |
Enforcement Agency |
Power Adjustment Factors |
NRCI-LTI-06-E |
Lighting - Indoor |
Enforcement Agency |
Videoconference Studio Lighting |
NRCI-LTO-01-E |
Lighting - Outdoor |
Enforcement Agency |
Outdoor Lighting |
NRCI-LTO-02-E |
Lighting - Outdoor |
Enforcement Agency |
Energy Management Control System (EMCS) or Lighting Control System |
NRCI-LTS-01-E |
Lighting - Sign |
Enforcement Agency |
Sign Lighting |
NRCI-MCH-01-E |
Mechanical |
Enforcement Agency |
Mechanical |
NRCI-PLB-01-E |
Plumbing |
Enforcement Agency |
Plumbing |
NRCI-PLB-02-E |
Plumbing |
Enforcement Agency |
High Rise Residential/Hotel/Motel Central Hot Water System Distribution |
NRCI-PLB-03-E |
Plumbing |
Enforcement Agency |
High Rise Residential/Hotel/Motel Single Dwelling Unit Hot Water System Distribution |
NRCI-PLB-21-H |
Plumbing |
HERS Verified Multifamily Central Hot Water System Distribution | |
NRCI-PLB-22-H |
Plumbing |
HERS Rater |
HERS Verified Single Dwelling Unit Hot Water System Distribution |
NRCI-PRC-01-E |
Process |
Enforcement Agency |
Covered Processes |
NRCI-SPV-01-E |
Solar Photovoltaic |
Enforcement Agency |
Solar Photovoltaic System |
NRCI-STH-01-E |
Solar Thermal Heating |
Enforcement Agency |
Solar Water Heating Systems |
Certificate of Acceptance | |||
NRCA-ENV-02-F |
Envelope |
Field Technician |
Fenestration Acceptance |
NRCA-ENV-03-F |
Envelope |
Field Technician |
Clerestories, horizontal slats and light shelves PAF |
NRCA-LTI-02-A |
Lighting - Indoor |
Acceptance Technician |
Lighting Control Acceptance Document |
NRCA-LTI-03-A |
Lighting - Indoor |
Acceptance Technician |
Automatic Daylighting Control Acceptance Document |
NRCA-LTI-04-A |
Lighting - Indoor |
Acceptance Technician |
Demand Responsive Lighting Control Acceptance Document |
NRCA-LTI-05-A |
Lighting – Indoor |
Acceptance Technician |
Institutional Tuning PAF Acceptance Document |
NRCA-LTO-02-A |
Lighting - Outdoor |
Acceptance Technician |
Outdoor Lighting Acceptance Tests |
NRCA-MCH-02-A |
Mechanical |
Acceptance Technician |
Outdoor Air Acceptance |
NRCA-MCH-03-A |
Mechanical |
Acceptance Technician |
Constant Volume, Single Zone, Unitary (Packaged & Split) AC & Heat Pump Systems |
NRCA-MCH-04-H |
Mechanical |
HERS Rater |
Air Distribution Duct Leakage |
NRCA-MCH-05-A |
Mechanical |
Acceptance Technician |
Air Economizer Controls Acceptance |
NRCA-MCH-06-A |
Mechanical |
Acceptance Technician |
Demand Control Ventilation (DVC) Systems Acceptance |
NRCA-MCH-07-A |
Mechanical |
Acceptance Technician |
Supply Fan Variable Flow Controls (VFC) Acceptance |
NRCA-MCH-08-A |
Mechanical |
Acceptance Technician |
Valve Leakage Test |
NRCA-MCH-09-A |
Mechanical |
Acceptance Technician |
Supply Water Temperature Reset Controls Acceptance |
NRCA-MCH-10-A |
Mechanical |
Acceptance Technician |
Hydronic System Variable Flow Controls Acceptance |
NRCA-MCH-11-A |
Mechanical |
Acceptance Technician |
Automatic Demand Shed Control Acceptance |
NRCA-MCH-12-A |
Mechanical |
Acceptance Technician |
Fault Detection & Diagnostics for Packaged DX Units |
NRCA-MCH-13-A |
Mechanical |
Acceptance Technician |
Automatic Fault Detection & Diagnostics for Air Handling & Zone Terminal Units Acceptance |
NRCA-MCH-14-A |
Mechanical |
Acceptance Technician |
Distributed Energy Storage DX AC Systems Acceptance |
NRCA-MCH-15-A |
Mechanical |
Acceptance Technician |
Thermal Energy Storage (TES) System Acceptance |
NRCA-MCH-16-A |
Mechanical |
Acceptance Technician |
Supply Air Temperature Reset Controls Acceptance |
NRCA-MCH-17-A |
Mechanical |
Acceptance Technician |
Condenser Water Temperature Reset Controls Acceptance |
NRCA-MCH-18-A |
Mechanical |
Acceptance Technician |
Energy Management Control System (EMCS) Acceptance |
NRCA-MCH-19-A |
Mechanical |
Acceptance Technician |
Occupancy Sensor Acceptance |
NRCA-PRC-01-F |
Process |
Field Technician |
Compressed Air System Acceptance |
NRCA-PRC-02-F |
Process |
Field Technician |
Commercial Kitchen Exhaust System Acceptance |
NRCA-PRC-03-F |
Process |
Field Technician |
Enclosed Parking Garage Exhaust System Acceptance |
NRCA-PRC-04-F |
Process |
Field Technician |
Refrigerated Warehouse - Evaporator Fan Motor Controls |
NRCA-PRC-05-F |
Process |
Field Technician |
Refrigerated Warehouse - Evaporative Condenser Controls Acceptance |
NRCA-PRC-06-F |
Process |
Field Technician |
Refrigerated Warehouse - Air-Cooled Condenser Controls Acceptance |
NRCA-PRC-07-F |
Process |
Field Technician |
Refrigerated Warehouse - Variable Speed Compressor Acceptance |
NRCA-PRC-08-F |
Process |
Field Technician |
Refrigerated Warehouse - Electric Resistance Underslab Heating System |
NRCA-PRC-12-F |
Process |
Field Technician |
Elevator Lighting & Ventilation Controls |
NRCA-PRC-13-F |
Process |
Field Technician |
Escalators & Moving Walkways Speed Controls |
NRCA-PRC-14-F |
Process |
Field Technician |
Lab Exhaust Ventilation |
NRCA-PRC-15-F |
Process |
Field Technician |
Fume Hood Automatic Sash Closure System |
NRCA-PRC-16-F |
Process |
Field Technician |
Adiabatic Condensers |
Certificate of Verification | |||
NRCV-MCH-04a-H |
Mechanical |
HERS Rater |
Duct Leakage Diagnostic Test - New System |
NRCV-MCH-04c-H |
Mechanical |
HERS Rater |
Duct Leakage Diagnostic Test - Low Leakage Air-Handling Units |
NRCV-MCH-04d-H |
Mechanical |
HERS Rater |
Duct Leakage Diagnostic Test - Altered (Existing) System |
NRCV-MCH-04e-H |
Mechanical |
HERS Rater |
Duct Leakage Diagnostic Test - Sealing of All Accessible Leaks |
NRCV-MCH-24a-H |
Mechanical |
HERS Rater |
Building Envelope Air Leakage Worksheet for IAQ – Manual Meter |
NRCV-MCH-24b-H |
Mechanical |
HERS Rater |
Building Envelope Air Leakage Worksheet for IAQ – Automatic Meter |
NRCV-MCH-27b-H |
Mechanical |
HERS Rater |
IAQ - Multifamily |
NRCV-MCH-27c-H |
Mechanical |
HERS Rater |
IAQ - Multifamily intermittent Scheduled and Real-time control |
NRCV-PLB-21-H |
Plumbing |
HERS Rater |
HERS Verified Multifamily Central Hot Water System Distribution |
NRCV-PLB-22-H |
Plumbing |
HERS Rater |
HERS Verified Single Dwelling Unit Hot Water System Distribution |