Section 120.8 – Link to Sections 120.8(a)-120.8(i)

'Standards

120.8(a) Summary of Commissioning Requirements

120.8(b) Owner’s or Owner Representative’s Project Requirements (OPR).

120.8(c) Basis of Design (BOD)

120.8(d) Design Phase Design Review

120.8(e) Commissioning measures shown in the construction documents

120.8(f) Commissioning Plan

120.8(g) Functional performance testing

120.8(h) Documentation and training.

120.8(i) Commissioning report.