NA5.7 Visual Inspection and Diagnostic Evaluation of Air Leakage After Test Failure Visual Inspection

1.   Ensure that all temporary seals and covers for intentional openings such as at louvers, exhaust/intake vents, fireplaces, and rooftop units are properly sealed and not damaged or loosened during the construction.

2.   Ensure that all plumbing-traps are filled with water.

3.   Ensure that all operable windows, trickle-vents, and doors are properly shut and locked.

4.   Ensure that all mechanical systems are shut-off and any mechanical dampers set to the closed position.

Diagnostic Evaluation

5.   Identify locations with air leakage using infrared thermography or smoke pens in accordance with ASTM E1186-17, while the building is maintained at a minimum 25 Pa pressure (during pressurization) or –25 Pa (during depressurization). The following locations shall be evaluated:

a.   The perimeter of windows and doors.

b.   Around operable window hardware and door hardware

c.   Penetrations through the roof, wall, and floor assemblies along the plane of the intended air-barrier.

d.   Electrical outlets located on exterior-facing walls.

e.   Lighting and other electrical penetrations through the roof level ceiling.

f.    Above- and below-grade vestibules.

g.   Stairs leading to unconditioned space.