Note: Visit the CEC web site to download the forms 'listed below.
# |
Doc Type |
Doc Category |
Category Description |
Document Description |
Pages |
Prescriptive Certificate of Compliance | |||||
1 |
CF1R- |
NCB-01-E |
Newly Constructed Buildings |
Newly Constructed Buildings and Additions Greater Than 1000 ft2 (Prescriptive) |
|
2 |
CF1R- |
ADD-01-E |
Additions |
Additions less than 1,000 ft2 (Prescriptive) |
|
3 |
CF1R- |
ALT-01-E |
Alterations |
Non-HVAC Alterations (Prescriptive) Break Out by Type |
|
4 |
CF1R- |
ALT-02-E |
Alterations |
HVAC Alterations |
|
5 |
CF1R- |
ALT-03-E |
Alterations-HVAC |
Paper version of ALT-HVAC for CZ 1, 3-7,16 |
|
6 |
CF1R- |
ALT-04-E |
Alterations-HVAC |
Paper version of ALT HVAC-CZ 2, 8-15 |
|
7 |
CF1R- |
ENV-02-E |
Work Sheet |
Area Weighted Average Calculation Worksheet |
|
8 |
CF1R- |
ENV-03-E |
Work Sheet |
Solar Heat Gain Coefficient (SHGC) Worksheet |
|
9 |
CF1R- |
ENV-04-E |
Work Sheet |
| |
10 |
CF1R- |
PLB-01-E |
Work Sheet |
Hydronic Heating System Worksheet |
|
11 |
CF1R- |
SRA-01-E |
Work Sheet |
Solar Ready Areas |
|
12 |
CF1R- |
SRA-02-E |
Work Sheet |
Minimum Solar Zone Area Worksheet |
|
13 |
CF1R- |
STH-01-E |
Work Sheet |
OG 300 Solar Water Heating System Worksheet |
|
14 |
CF1R- |
STH-02-E |
Work Sheet |
OG 100 Solar Water Heating System Worksheet (California F-Chart) |
|
Certificate of Installation | |||||
15 |
CF2R- |
ENV-01-E |
Envelope-NonHERS |
Fenestration; and Site-built Fenestration |
|
16 |
CF2R- |
ENV-02-E |
Envelope-NonHERS |
Envelope Air Sealing Requirements |
|
17 |
CF2R- |
ENV-03-E |
Envelope-NonHERS |
Insulation Installation |
|
18 |
CF2R- |
ENV-04-E |
Envelope-NonHERS |
Roofing; Radiant Barriers |
|
19 |
CF2R- |
ENV-20a-H |
Envelope-HERS |
Building Envelope Air Leakage - Single-Point Test with Manual Meter |
|
20 |
CF2R- |
ENV-20b-H |
Envelope-HERS |
Building Envelope Air Leakage - Single-Point Test with Automatic Meter |
|
21 |
CF2R- |
ENV-20c-H |
Envelope-HERS |
Building Envelope Air Leakage - Multi-Point Test |
|
22 |
CF2R- |
ENV-20d-H |
Envelope-HERS |
Building Envelope Air Leakage - Repeated Single Point with Manual Meter |
|
23 |
CF2R- |
ENV-20e-H |
Envelope-HERS |
Building Envelope Air Leakage - Repeated Single Point with Automatic Meter |
|
24 |
CF2R- |
ENV-21-H |
Envelope-HERS |
Quality Insulation Installation (QII) –Air Infiltration Sealing - Framing Stage for Batt, Loose Fill, and SPF |
|
25 |
CF2R- |
ENV-22-H |
Envelope-HERS |
Quality Insulation Installation (QII) - Air Infiltration Sealing - Ceiling/Roof Deck |
|
26 |
CF2R- |
ENV-23-H |
Envelope-HERS |
Quality Insulation Installation (QII) - Insulation Stage |
|
27 |
CF2R- |
ENV-24-H |
Envelope-HERS |
Quality Insulation Installation (QII) – Air Infiltration Sealing - Framing Stage for SIP and ICF |
|
28 |
CF2R- |
LTG-01-E |
Lighting-NonHERS |
Lighting - Single Family Dwellings |
|
29 |
CF2R- |
LTG-02-E |
Lighting-NonHERS |
Lighting - Multifamily Dwellings |
|
30 |
CF2R- |
MCH-01a-E |
Mechanical-NonHERS |
HVAC Systems, Ducts and Fans - Performance |
|
31 |
CF2R- |
MCH-01b-E |
Mechanical-NonHERS |
HVAC Systems, Ducts and Fans - Prescriptive Alterations |
|
32 |
CF2R- |
MCH-01c-E |
Mechanical-NonHERS |
HVAC Systems, Ducts and Fans - Prescriptive Newly Constructed Buildings |
|
33 |
CF2R- |
MCH-02-E |
Mechanical-NonHERS |
Whole House Fan |
|
34 |
CF2R- |
MCH-04-E |
Mechanical-NonHERS |
Evaporative Coolers |
|
35 |
CF2R- |
MCH-20a-H |
Mechanical-HERS |
Duct Leakage Measurement - New System |
|
36 |
CF2R- |
MCH-20b-H |
Mechanical-HERS |
Duct Leakage Measurement - Low Leakage Ducts in Conditioned Space – Compliance Credit; |
|
37 |
CF2R- |
MCH-20c-H |
Mechanical-HERS |
Duct Leakage Measurement - Low Leakage Air-Handling Units |
|
38 |
CF2R- |
MCH-20d-H |
Mechanical-HERS |
Duct Leakage Measurement - – Altered (Existing) System |
|
39 |
CF2R- |
MCH-20e-H |
Mechanical-HERS |
Duct Leakage Measurement - Sealing of All Accessible Leaks |
|
40 |
CF2R- |
MCH-21-H |
Mechanical-HERS |
Duct Location Verification |
|
41 |
CF2R- |
MCH-22a-H |
Mechanical-HERS |
Forced Air System Fan Efficacy (Watt/cfm) - Single Zone Systems or Zonally Controlled Systems with All Zones Calling |
|
42 |
CF2R- |
MCH-22b-H |
Mechanical-HERS |
Forced Air System Fan Efficacy (Watt/cfm) - Zonally Controlled Systems in Every Zonal Control Mode |
|
43 |
CF2R- |
MCH-23a-H |
Mechanical-HERS |
Forced Air System Airflow Rate (cfm/ton) - Single Zone Systems or Zonally Controlled Systems with All Zones Calling - compliance using RA3.3 methods |
|
44 |
CF2R- |
MCH-23b-H |
Mechanical-HERS |
Forced Air System Airflow Rate (cfm/ton) - Zonally Controlled Systems in Every Zonal Control Mode - compliance using RA3.3 methods |
|
45 |
CF2R- |
MCH-23c-H |
Mechanical-HERS |
Forced Air System Airflow Rate - compliance using Alternative Compliance using RA3.2.2.7.3 methods |
|
46 |
CF2R- |
MCH-23d-H |
Mechanical-HERS |
Forced Air System Airflow Rate - Measurement Only (CFM) - Single Zone Systems or Zonally Controlled Systems with All Zones Calling - compliance using RA3.3 methods |
|
47 |
CF2R- |
MCH-24a-H |
Envelope-HERS |
Building Envelope Air Leakage Worksheet - Single-Point Test with Manual Meter |
|
48 |
CF2R- |
MCH-24b-H |
Envelope-HERS |
Building Envelope Air Leakage Worksheet - Single-Point Test with Automatic Meter |
|
49 |
CF2R- |
MCH-24c-H |
Envelope-HERS |
Building Envelope Air Leakage Worksheet - Multi-Point Test |
|
50 |
CF2R- |
MCH-24d-H |
Envelope-HERS |
Building Envelope Air Leakage Worksheet - Repeated Single Point with Manual Meter |
|
51 |
CF2R- |
MCH-24e-H |
Envelope-HERS |
Building Envelope Air Leakage Worksheet - Repeated Single Point with Automatic Meter |
|
52 |
CF2R- |
MCH-25a-H |
Mechanical-HERS |
Refrigerant Charge Verification - superheat method (Standard Charge Procedure) |
|
53 |
CF2R- |
MCH-25b-H |
Mechanical-HERS |
Refrigerant Charge Verification - subcooling (Standard Charge Procedure) |
|
54 |
CF2R- |
MCH-25c-H |
Mechanical-HERS |
Refrigerant Charge Verification - Weigh-in Procedure |
|
55 |
CF2R- |
MCH-25d-H |
Mechanical-HERS |
Refrigerant Charge Verification - Charge Indicator Display (CID) (note: not a standalone document - embedded in CF2R-MCH-25a,b,e) |
|
56 |
CF2R- |
MCH-25e-H |
Mechanical-HERS |
Refrigerant Charge Verification - Winter Setup for Standard Charge Verification |
|
57 |
CF2R- |
MCH-25f-E |
Mechanical-NonHERS |
Refrigerant Charge Verification - Packaged System Manufacturer Refrigerant Charge Certification |
|
58 |
CF2R- |
MCH-26-H |
Mechanical-HERS |
Rated Space Conditioning System Equipment Verification |
|
59 |
CF2R- |
MCH-27a-H |
Mechanical-HERS |
Mechanical Ventilation - Continuous Whole-Building Mechanical Ventilation Airflow - Fan Vent Rate Method |
|
60 |
CF2R- |
MCH-27b-H |
Mechanical-HERS |
Mechanical Ventilation - Continuous Whole-Building Mechanical Ventilation Airflow - Total Vent Rate Method |
|
61 |
CF2R- |
MCH-27c-H |
Mechanical-HERS |
Mechanical Ventilation - Intermittent Whole-Building Mechanical Ventilation Airflow- Fan Vent Rate Method |
|
62 |
CF2R- |
MCH-27d-H |
Mechanical-HERS |
Mechanical Ventilation - Intermittent Whole-Building Mechanical Ventilation Airflow - Total Vent Rate Method |
|
63 |
CF2R- |
MCH-28-H |
Mechanical-HERS |
Return Duct And Filter Grille Design According to Tables 150.0-C or D |
|
64 |
CF2R- |
MCH-29-H |
Mechanical-HERS |
Supply Duct Surface Area and R-Value; Buried Ducts; Deeply Buried Ducts |
|
65 |
CF2R- |
MCH-30-H |
Mechanical-HERS |
Ventilation cooling compliance credit |
|
66 |
CF2R- |
PLB-01-E |
Plumbing-DHW-NonHERS |
Multifamily Central Hot Water System Distribution - NON-HERS |
|
67 |
CF2R- |
PLB-02-E |
Plumbing-DHW-NonHERS |
Single Dwelling Unit Hot Water System Distribution |
|
68 |
CF2R- |
PLB-03-E |
Plumbing-DHW-NonHERS |
Pool and Spa Systems |
|
69 |
CF2R- |
PLB-21-H |
Plumbing-DHW-HERS |
HERS - Multifamily Central Hot Water System Distribution |
|
70 |
CF2R- |
PLB-22-H |
Plumbing-DHW-HERS |
HERS - Single Dwelling Unit Hot Water System Distribution |
|
71 |
CF2R- |
SPV-01a-E |
Photovoltaic |
PV Systems - Photo Voltaic Systems Compliance Credits |
|
72 |
CF2R- |
SPV-01b-E |
Photovoltaic |
PV Systems - Exception to Solar Ready Area requirements |
|
73 |
CF2R- |
SPV-01c-E |
Photovoltaic |
PV Systems - PV Compliance Credits + Exceptions to SRA requirements |
|
74 |
CF2R- |
STH-01-E |
Solar Thermal |
Solar Water Heating Systems |
|
Certificate of Verification | |||||
75 |
CF3R- |
ENV-20a-H |
Envelope-HERS |
Building Envelope Air Leakage - Single-Point Test with Manual Meter |
|
76 |
CF3R- |
ENV-20b-H |
Envelope-HERS |
Building Envelope Air Leakage - Single-Point Test with Automatic Meter |
|
77 |
CF3R- |
ENV-20c-H |
Envelope-HERS |
Building Envelope Air Leakage - Multi-Point Test |
|
78 |
CF3R- |
ENV-20d-H |
Envelope-HERS |
Building Envelope Air Leakage - Repeated Single Point with Manual Meter |
|
79 |
CF3R- |
ENV-20e-H |
Envelope-HERS |
Building Envelope Air Leakage - Repeated Single Point with Automatic Meter |
|
80 |
CF3R- |
ENV-21-H |
Envelope-HERS |
Quality Insulation Installation (QII)-Framing Stage - wood frame |
|
81 |
CF3R- |
ENV-22-H |
Envelope-HERS |
Quality Insulation Installation (QII) - Ceiling/Roof Deck - Air Infiltration Sealing |
|
82 |
CF3R- |
ENV-23-H |
Envelope-HERS |
Quality Insulation Installation (QII) - Insulation Stage |
|
83 |
CF3R- |
ENV-24-H |
Envelope-HERS |
Quality Insulation Installation (QII)-Framing Stage - sip and icf |
|
84 |
CF3R- |
EXC-20-H |
Existing Conditions |
HERS Verification for Existing Conditions for performance compliance for alterations. |
|
85 |
CF3R- |
MCH-20a-H |
Mechanical-HERS |
Duct Leakage Measurement - New System |
|
86 |
CF3R- |
MCH-20b-H |
Mechanical-HERS |
Duct Leakage Measurement - Low Leakage Ducts in Conditioned Space – Compliance Credit; |
|
87 |
CF3R- |
MCH-20c-H |
Mechanical-HERS |
Duct Leakage Measurement - Low Leakage Air-Handling Units |
|
88 |
CF3R- |
MCH-20d-H |
Mechanical-HERS |
Duct Leakage Measurement - – Altered (Existing) System |
|
89 |
CF3R- |
MCH-20e-H |
Mechanical-HERS |
Duct Leakage Measurement - Sealing of All Accessible Leaks |
|
90 |
CF3R- |
MCH-21-H |
Mechanical-HERS |
Duct Location Verification |
|
91 |
CF3R- |
MCH-22a-H |
Mechanical-HERS |
Forced Air System Fan Efficacy (Watt/cfm) - Single Zone Systems or Zonally Controlled Systems with All Zones Calling |
|
92 |
CF3R- |
MCH-22b-H |
Mechanical-HERS |
Forced Air System Fan Efficacy (Watt/cfm) - Zonally Controlled Systems in Every Zonal Control Mode |
|
93 |
CF3R- |
MCH-23a-H |
Mechanical-HERS |
Forced Air System Airflow Rate (cfm/ton) - Single Zone Systems or Zonally Controlled Systems with All Zones Calling - compliance using RA3.3 methods |
|
94 |
CF3R- |
MCH-23b-H |
Mechanical-HERS |
Forced Air System Airflow Rate (cfm/ton) - Zonally Controlled Systems in Every Zonal Control Mode - compliance using RA3.3 methods |
|
95 |
CF3R- |
MCH-23c-H |
Mechanical-HERS |
Forced Air System Airflow Rate compliance using Alternative Compliance using RA3.2.2.7.3 methods ( best that I can do) |
|
96 |
CF3R- |
MCH-23d-H |
Mechanical-HERS |
Forced Air System Airflow Rate - Measurement Only (CFM) - Single Zone Systems or Zonally Controlled Systems with All Zones Calling - compliance using RA3.3 methods |
|
97 |
CF3R- |
MCH-24a-H |
Envelope-HERS |
Building Envelope Air Leakage Worksheet - Single-Point Test with Manual Meter |
|
98 |
CF3R- |
MCH-24b-H |
Envelope-HERS |
Building Envelope Air Leakage Worksheet - Single-Point Test with Automatic Meter |
|
99 |
CF3R- |
MCH-24c-H |
Envelope-HERS |
Building Envelope Air Leakage Worksheet - Multi-Point Test |
|
100 |
CF3R- |
MCH-24d-H |
Envelope-HERS |
Building Envelope Air Leakage Worksheet - Repeated Single Point with Manual Meter |
|
101 |
CF3R- |
MCH-24e-H |
Envelope-HERS |
Building Envelope Air Leakage Worksheet - Repeated Single Point with Automatic Meter |
|
102 |
CF3R- |
MCH-25a-H |
Mechanical-HERS |
Refrigerant Charge Verification - superheat method (Standard Charge Procedure) |
|
103 |
CF3R- |
MCH-25b-H |
Mechanical-HERS |
Refrigerant Charge Verification - subcooling (Standard Charge Procedure) |
|
104 |
CF3R- |
MCH-25c-H |
Mechanical-HERS |
Refrigerant Charge Verification - Weigh-in Procedure (observation only) |
|
105 |
CF3R- |
MCH-25d-H |
Mechanical-HERS |
Refrigerant Charge Verification - Charge Indicator Display (CID) |
|
106 |
CF3R- |
MCH-25e-H |
Mechanical-HERS |
Refrigerant Charge Verification - Winter Setup for Standard Charge Verification |
|
107 |
CF3R- |
MCH-26-H |
Mechanical-HERS |
Rated Space Conditioning System Equipment Verification |
|
108 |
CF3R- |
MCH-27a-H |
Mechanical-HERS |
Mechanical Ventilation - Continuous Whole-Building Mechanical Ventilation Airflow - Fan Vent Rate Method |
|
109 |
CF3R- |
MCH-27b-H |
Mechanical-HERS |
Mechanical Ventilation - Continuous Whole-Building Mechanical Ventilation Airflow - Total Vent Rate Method |
|
110 |
CF3R- |
MCH-27c-H |
Mechanical-HERS |
Mechanical Ventilation - Intermittent Whole-Building Mechanical Ventilation Airflow |
|
111 |
CF3R- |
MCH-27d-H |
Mechanical-HERS |
Mechanical Ventilation - Intermittent Whole-Building Mechanical Ventilation Airflow - Total Vent Rate Method |
|
112 |
CF3R- |
MCH-28-H |
Mechanical-HERS |
Return Duct And Filter Grille Design According to Tables 150.0-C or D |
|
113 |
CF3R- |
MCH-29-H |
Mechanical-HERS |
Supply Duct Surface Area and R-Value; Buried Ducts; Deeply Buried Ducts |
|
114 |
CF3R- |
MCH-30-H |
Mechanical-HERS |
Ventilation cooling compliance credit |
|
115 |
CF3R- |
PLB-21-H |
Plumbing-DHW-HERS |
HERS - Multifamily Central Hot Water System Distribution |
|
116 |
CF3R- |
PLB-22-H |
Plumbing-DHW-HERS |
HERS - Single Dwelling Unit Hot Water System Distribution |
|
117 |
NRCV- |
MCH-04a-H |
Mechanical-HERS |
Duct Leakage Measurement - New System |
|
118 |
NRCV- |
MCH-04c-H |
Mechanical-HERS |
Duct Leakage Measurement - Low Leakage Air-Handling Units |
|
119 |
NRCV- |
MCH-04d-H |
Mechanical-HERS |
Duct Leakage Measurement - – Altered (Existing) System |
|
120 |
NRCV- |
MCH-04e-H |
Mechanical-HERS |
Duct Leakage Measurement - Sealing of All Accessible Leaks |
|
121 |
NRCV- |
PLB-21-H |
Plumbing-DHW-HERS |
HERS - High Rise Multifamily Central Hot Water System Distribution |
|
122 |
NRCV- |
PLB-22-H |
Plumbing-DHW-HERS |
HERS - High Rise Single Dwelling Unit Hot Water System Distribution |
|