7.8 Battery Ready Overview

All single-family homes with one or two dwelling units must be Energy Storage System (ESS) ready to facilitate the future installation of a battery system. The following requirements must be met. There are no exceptions.

  1. At least one of the following shall be provided:
    1. ESS ready interconnection equipment with a minimum backed up capacity of 60 amps and a minimum of four ESS supplied branch circuits. or
    2. A dedicated 1” minimum raceway from the main service to a subpanel that supplies the branch circuits described in #2 below. The subpanel must be labeled “Subpanel shall include all backed-up load circuits.” All branch circuits are permitted to be supplied by the main service panel prior to the installation of an ESS.
  2. A minimum of four branch circuits shall be identified and have their source of supply collocated at the subpanel referenced in #1b above to be supplied by the ESS. At least one circuit must supply the refrigerator, one lighting circuit near the primary egress, and at least one circuit shall supply a sleeping room receptacle outlet. There is no requirement for what is supplied by the fourth circuit.
  3. The main panelboard shall have a minimum busbar rating of 225 amps.
  4. Sufficient space shall be reserved to allow future installation of a system isolation equipment/transfer switch within 3 feet of the main panelboard. Raceways shall be installed between the panelboard and the system isolation equipment transfer switch location to allow the connection of backup power source.

This panel displays referenced content when certain links are clicked.

This program is funded by California utility customers and administered by Pacific Gas and Electric Company (PG&E), San Diego Gas & Electric Company (SDG&E®), and Southern California Edison Company (SCE) under the auspices of the California Public Utilities Commission.

© 2024 PG&E, SDG&E and SCE. All rights reserved, except that this content may be used, copied, and distributed without modification. Neither PG&E, SDG&E, nor SCE — nor any of their employees makes any warranty, express of implied; or assumes any legal liability or responsibility for the accuracy, completeness or usefulness of any data, information, method, product, policy or process disclosed in this document; or represents that its use will not infringe any privately-owned rights including, but not limited to patents, trademarks or copyrights.